CASE STUDY
- Filter by Product
-
Paperless Operations with Bluetooth® Connectivity: Reduce Work Time by Over 20%
Situation
[Cyprus] Previously, measurement results had to be recorded manually, making data management and report generation time-consuming. In addition, I didn’t have a single instrument that could perform continuity, insulation resistance, earth resistance, and RCD tests.- MULTI FUNCTION INSTALLATION TESTER
- NEW
- Work efficiency
- Inspection
- Paperless
More details
-
Quick identification of the cause of an unintentional breaker trip
Situation
[Japan] A breaker unintentionally tripped, and identifying the cause was difficult.- LEAKAGE CLAMP METER
- NEW
- Renovation
More details
-
Quickly check analog signal transmission without shutting down the installation
Situation
[Japan] We had been using a multimeter to check analog signals on equipment such as I/P converters. Since the multimeter had to be connected in series with the equipment, it was necessary to either shut down the equipment or prepare additional wiring in advance. As a result, troubleshooting typically took 30 to 60 minutes.- DC MILLIAMP CLAMP METER
- NEW
- Work efficiency
- Work quality
More details
-
Stress-free troubleshooting
Situation
[Italy] Without going over-budget, there was no multimeter that was satisfactory in every respect, including: Analog meters: transient response, precision, susceptibility to static buildup, and durability. Digital meters: readability, functions, and the operation of the auto power‑off feature.- ANALOG MULTIMETER
- DIGITAL MULTIMETER
- NEW
- Work efficiency
- Work quality
More details
-
Simplifying Three-Phase Voltage Connections for Power Measurement
Situation
[Japan] When using a power meter, connecting the voltage test leads to the terminals one by one was cumbersome, and we were concerned that the clips might come loose during measurement.- 3P BREAKER ADAPTER
- NEW
- Work efficiency
- Work quality
- Safety
- Versatility
More details
-
Speed Up Troubleshooting of Signal Converters to Improve Equipment Maintenance
Situation
[Japan] We used to disconnect cables to test signal converters, which was time-consuming and required a lot of effort.- DC MILLIAMP CLAMP LOGGER
- NEW
- Work efficiency
- Work quality
- Inspection
More details
-
Ensure a smooth handover to customer after checking EV/PHEV charger
Situation
[Japan] There was an installation job for an EV/PHEV charger, but although it was installed, we were unable to verify whether the charger was functioning properly, so we had to confirm proper operation using the customer’s PHEV.- MULTI FUNCTION INSTALLATION TESTER
- EVSE ADAPTER
- Electric Vehicle
- Completion
- Work efficiency
- Work quality
- Inspection
More details
-
Verifying the energy-saving effect of upgrading from old equipment to new equipment
Situation
[Japan] We replaced the old equipment with new equipment due to aging. However, we were not sure how much energy could be saved by replacing the 20-year-old equipment with the new one.- POWER METER
- Energy-saving
More details
-
Perfect for EV Powertrain Testing, Cut Setup Time by approx. 40%
Situation
[India] With our existing multimeters, we frequently experienced issues with erroneous readings, which reduced the reliability of electrical diagnostics during powertrain testing and sometimes even led to misleading conclusions. In addition, the manual range-selection knob required us to repeatedly switch between voltage ranges during testing, making the process slow and cumbersome, and significantly decreasing our overall efficiency.- DIGITAL MULTIMETER
- AC/DC CLAMP METER
- Work efficiency
- Work quality
- Inspection
- Portability
- Outdoor Use
More details