CASE STUDY
-
Checking for Transducer Malfunctions
Situation
[Japan] When testing transducers (convertors) in a distribution board, there are cases where the central monitoring system cannot be started up. In such situations, the output wiring of the transducer was disconnected and a digital multimeter was connected for measurement. Similarly, when abnormal readings appeared on the central monitoring system on a board in operation, disconnecting the transducer output wiring during operation posed a high risk. Therefore, transducer testing was carried out during scheduled power outages to check for any malfunctions.- DC MILLIAMP CLAMP LOGGER
- NEW
- Renovation
- Work efficiency
- Inspection
More details
-
Successfully identified the circuit giving leakage alarm and determined the root cause
Situation
[Japan] A recorder we already owned was used to identify circuits with leakage current, but it was cumbersome to operate.- CURRENT & VOLTAGE LOGGER
- NEW
- Safety inspection, maintenance
- Work efficiency
More details
-
Working time decreased by approximately 40%
Situation
[Japan] For electrical installation inspections, we had to carry both a simplified earth resistance tester and a low-voltage insulation resistance tester, leaving both hands occupied.- INSULATION EARTH TESTER
- NEW
- Work efficiency
- Inspection
More details